Garden City, Texas – 130 MW
Year
2024
Client
Nexora
The Challenge
The Garden City facility showcases Sonamu Energy’s capacity for innovative energy integration—combining 130 MW of hybrid power sourced from wind generation and grid interconnection. This dual-source configuration enables flexible energy management, blending sustainability with commercial optimization through dynamic load balancing and curtailment participation.
Situated in West Texas, Garden City benefits from both low-cost wind resources and access to ERCOT wholesale markets, allowing Sonamu to execute advanced power arbitrage strategies that enhance returns while maintaining operational stability. The project serves as a model for the next generation of hybrid energy-to-computation facilities, aligning environmental responsibility with financial performance.
Key Attributes:
-
130 MW hybrid power infrastructure (wind + grid)
-
Dynamic energy balancing and power arbitrage capability
-
Designed for AI, blockchain, and cloud-scale computing
-
Strong sustainability profile with commercially disciplined execution



