Odessa, Texas – 270 MW
Year
2023
Client
Spectral
The Challenge
The Odessa facility stands as the cornerstone of Sonamu Energy’s national development platform—a fully permitted, 270-megawatt (MW) industrial complex strategically located in West Texas. Designed from inception to support high-performance computing, Bitcoin mining, and enterprise-grade data hosting, Odessa unites utility-scale energy infrastructure with rapid deployment capability in one of the most power-advantaged regions in North America.
With active interconnection approvals and a direct connection to ERCOT’s high-capacity transmission network, Odessa delivers power at 4–5¢ per kWh, enabling exceptional hosting margins and long-term scalability. The site’s first 65 MW phase is scheduled for energization within 12 months, with full buildout to 270 MW over the following 18 months—compressing a typical 3–5 year development timeline into less than two.
Odessa’s combination of regulatory readiness, market access, and physical infrastructure creates a turnkey platform for digital infrastructure deployment, positioning Sonamu Energy as a leading provider of power-to-computation solutions.
Key Attributes:
-
270 MW industrial power complex with full ERCOT interconnection
-
Phase 1: 65 MW operational within 12 months
-
Power Cost: 4–5¢ per kWh via favorable utility rates and wholesale market access
-
Revenue Model: Hosting, mining, and power arbitrage through ERCOT demand response
-
Strategic Location: West Texas industrial corridor with rail, highway, and fiber infrastructure
-
Development Efficiency: 3–5× faster deployment than traditional greenfield projects